Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED (1) COPY BACTERIA REPORT |
|
| 06/14/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) IN HOUSE BACKFLOW CERTIFICATION TURNED IN |
|
| 06/07/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL PROVIDE CLEAN BACTERIA REPORT FOR POTABLE WATER SYSTEM 2. SHALL PROVIDE TAPED CLEANOUT PLUG, MACHINE SCREW AND CLEANOUT COVER AT BREAK ROOM SINK 3. SHALL PROVIDE A MEANS TO CONTROL HOT WATER TEMPERATURE AT PUBLIC USE LAVS BESIDES WATER HEATER 4. PROVIDE CERTIFICATION FOR IN HOUSE RPBP BACKFLOW DEVICE SPRINKLER ROOM 118 |