Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2007 | SITE - SEWER | Approved | IVRS - Inspection :* | |
| 02/05/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
| 02/01/2007 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* 1) CONTRACTOR CANCELLED |
|
| 01/29/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* PRIVATE MANHOLE BASES POURED #1, #2, #3 OK TO STALL FROM MANHOLE #2 TO #3 6 SDR BEDDING, LAYING, TRACER, SHADING BACKFILL OK FROM PRIVATE MANHOLE #3 6" SDR 35 BACK TO EXISTING BUILDING SEWER STUB BEDDING, LAYING, TRACER OK 1. SHALL INSTALL CLEANOUT #4 PER PLAN. |
|
| 01/25/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* BEDDING, LAYING & TRACER FROM MANHOLE #2 TO 60 FROM MANHOLE #3 SHADING, BACKFILLING CONTINUES FROM PUBLIC TO MANHOLE #2 |
|
| 01/24/2007 | SITE - SEWER | Partial Approval | SHADING, BACKFILING CONTINUES PUBLIC MANHOLE TO PRIVATE MANHOLE #1, EXCAVATION, BEDDING, LAYING, TRACER CONTINUES FROM PRIVATE MANHOLE #2 APP. 180' UPSTREAM TOWARD MANHOLE #3. | |
| 01/22/2007 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* SNOW CLOSURE |
|
| 01/18/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 6" SDR 35 FROM MANHOLE #1 TO PRIVATE MANHOLE #2 BEDDING, LAYING, TRACER OK |
|
| 01/17/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 6" SDR 35 FROM MANHOLE #1 60' TOWARDS MANHOLE #2 BEDDING, PIPING, TRACER OK SEE NOTES FROM 1/16/06 INSPECTION |
|
| 01/16/2007 | SITE - SEWER | Partial Approval | IVRS - Inspection :* PRE CONST. MEETING WITH JOE, ARIZONA EXCAVATIING MIKE, CHESTNUT CONST. PIPING SHALL MEET 2003 PIMA COUNTY STANDARDS, FROM PUBLIC MANHOLE 8762-04 6" SDR 35 UPSTREAM TO PRIVATE MANHOLE #1 BEDDING, LAYING, TRACER OK SHALL AIR TEST PIPING, VACUUM TEST NEW MANHOLES, HAVE PROVIDED VERIFICATION OF GRADE FROM ENGINEER OR SURVEYOR AT LATER DATE. SHADING ON SITE. |