Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2007 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 05/25/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 7 LIGHT POLE BASES AS PER PLANS |
|
| 05/23/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1ST LIFT @ EAST SCREEN WALLS W/LAPS |
|
| 05/17/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SCREEN WALL FOOTING/STEM WALL NORTHWEST CORNER @ GENERATOR -- FUEL TANKS. |
|
| 03/21/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH STAIRS - STEP FORMS REINFORCING STEEL NORTH CARPORT COLUMN FOOTINGS -- 6 TOTAL |
|
| 03/13/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TWO EAST SIDE GENERATOR PADS & 1 FUEL TANK PAD |
|
| 03/08/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. STAIR FORMING @ GRID LINE C BETWEEN 2 & 3 2. STAIR FORMING @ GRID LINE C-7 EAST END OF BLDG |
|
| 03/07/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* WEST STAIRS (STEP REINFORCEMENT) AS PER SHEET S3.D DETAIL #105 |
|
| 03/02/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* F7 COLUMNS @ PARKING CANOPY |
|
| 03/01/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH & WEST STAIR WALLS AS PER DETAIL #107 ON SHEET S3.0 |
|
| 02/26/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* EAST CANOPY COLUMNS FOOTINGS (12) EQUIP. YARD SOUTH SIDE STAIR FOOTING & WEST SIDE STAIR FOOTING |
|
| 01/30/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BOTH ANTENNA FOUNDATIONS -- OK TO POUR |
|
| 01/26/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* DRYPACK AT GRID #1 A & E AND GRID #7 E NOTE: COLUMN @ GRID #7-D NOT DRY PACKED DAVID SCHWANKE 19681 PHOENIX LANE HUNTINGTON BEACH, CA 92646 714-964-7410 FAX 714-964-4040 |
|
| 01/03/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TOTAL OF 11 DRY PAC AT STEEL COLUMN BASES AT GRID LINE "A" 2 THRU 7 - AT GRID "1" B THRU D & AT GRID "7" AT B & C NOTE: REVISED APPROVED PLANS CONFIRM INSTALLED REINFORCING STEEL THAT WAS INSPECTED ON 12/6/2006 AS CORRECT AND IN AGREEMENT W/NEW PLANS SHEET S1.1 |
|
| 01/02/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CANCELLED BY CONTRACTOR |
|
| 12/06/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* OBSERVATION INSPECTION - PARTIAL APPROVAL OK TO POUR MAIN BUILDING PERIMETER AND COLUMN FOOTINGS AS PER NOTE BELOW -- AWAITING NEW APPROVED PLANS WHICH MUST MATCH OBSERVATION NOTES. NOTE #1: 1. PERIMETER FOOTING F-6 - 2 #5'S CONTINUOUS W/1 #4 @ 24" O.C AND #5 VERTICALS @ 48" O.C 2. PERIMETER & INTERIOR BEARING F- 5 FOOTINGS - 2- #5 CONTINUOUS T & B W/1 #4 @ 24" O.C 3. F-1 COLUMN FOOTINGS - 4 - #4'S EACH WAY - 2'6"X2'6" (8 EACH) 4. F-2 COLUMN FOOTINGS - 5 - #4'S EACH WAY 3'6" X 3'6" (7 EACH) 5. F-3 COLUMN FOOTINGS - 4 - #4'S EACH WAY 3'0" X 3'0" (5 EACH) 6. F-4 COLUMN FOOTINGS - 4- #5'S EACH WAY 4'6" X 4'6" (5 EACH NOTE #2: REINFORCING STEEL IN ABOVE FOOTINGS MUST MATCH THE SCHEDULE ON THE NEW PLANS WHEN THEY ARE APPROVED BY THE CITY. ABOVE INSPECTION CONDUCTED PER JESSE SANDERS - PROCEED AT OWN RISK |
|
| 12/04/2006 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* WAITING ON NEW APPROVED PLANS. |