Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2008 | GRADING - INTERMEDIATE | Approved | AP | |
| 03/12/2008 | GRADING - INTERMEDIATE | Correction Required | SIDEWALK FROM S SIDE OF BUILDING ADA ACCESSIBLE ROUTE NEEDS TO BE INSTALLED | |
| 03/07/2008 | GRADING - INTERMEDIATE | Correction Required | AT S SIDE OF BUILDING SUBGRADE DID NOT PASS ASPHALT BRIDGE BEING PLACED |
|
| 03/06/2008 | GRADING - INTERMEDIATE | Correction Required | MET ONSITE WITH THAD HARVISON AND BOBBY RUIZ COT TRANSPORTATION PER THAD NO HANDRAIL REQ'D NO SLOPE STABILIZATION WHERE ASHTON DID WORK IN DRAINAGEWAY DAVE ROBERTS IS TO CHECK WITH JOE LINVILLE RE SLOPE REQUIREMENTS - REQ'D BY LUC |
|
| 03/04/2008 | GRADING - INTERMEDIATE | Correction Required | MET ON SITE WITH BOBBY RUIZ (COT) RE DRAINAGE WORK/PIA DONE BY ASHTON EMAIL TO THAD REQUESTING ONSITE MEET BOBBY IS SUPPOSED TO TALK TO THAD REGARDING THIS PROJECT |
|
| 03/03/2008 | GRADING - INTERMEDIATE | Correction Required | CHECKED SITE-LEFT MESSAGE FOR JIM F REGARDING DRAINAGEWAY WORK AND NEED TO ADDRESS SLOPE/HANDRAIL | |
| 02/28/2008 | GRADING - INTERMEDIATE | Partial Approval | MET ON SITE WITH JIM TO LOOK AT DRAINAGEWAY-MAY NEED HANDRAIL | |
| 02/21/2008 | GRADING - INTERMEDIATE | Partial Approval | MET ON SITE WITH WARREN REVIEWED H/C ACCESS ROUTE CONCERNS REGARDING DRAINAGEWAY SLOPE AT EAST SIDE OF SITE |
|
| 10/18/2007 | GRADING - INTERMEDIATE | Partial Approval | MET ON SITE WITH BILL KOCH AND WARREN REGARDING WEST SIDE OF BUILDING WHERE ELECTRIC PANELS WILL ENCROACH ON ADA SIDEWALK AREA CONTACTED GLENN DABBS FOR INPUT-HE WILL CHECK SITE TODAY DURING RETAINING WALL INSPECTION |
|
| 10/09/2007 | GRADING - INTERMEDIATE | Partial Approval | TALKED TO EEC REGARDING H/C RAMP AT SW CORNER OF CAR WASH NO CONCERNS WITH REMOVAL OF SOUTH RAMP |
|
| 09/04/2007 | GRADING - INTERMEDIATE | Partial Approval | FOOTERS BEING POURED FOR RETAINING WALL |