Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T06BU01916
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/03/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | STORMWATER PRE-CON DOCUMENT HAS BEEN COMPLETED BY KARL RYAN WITH THE EXCEPTION OF ITEMS COVERED IN THE D.O.T. PRE-CON DOCUMENT. | |
02/12/2008 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | I MET WITH KARL RYAN TO REVIEW THE PRE-CON FORM, KARL WILL REVIEW THE FORM AND HE WILL COPY AND SIGN AT A LATER DATE. | |
01/28/2008 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | PARTIAL APPROVAL MEET WITH KARL RYAN/PULTE HOMES AND MIKE BAUER/BORDERLAND. DUE TO THE SIZE OF THIS PROJECT, THE GRUBBING OF THE SITE WILL BE COMPLETED IN PHASES, THE GRADING CONTRACTOR WILL INSTALL GRADER TRENCHES AND BERMS TO CONTROL STORMWATER RUN-OFF. INSPECTOR WILL CONDUCT PERIODIC INSPECTIONS DURING THE GRUBBING OPERATIONS TO MONITOR COMPLIANCE WITH SWPPP REQUIREMENTS. A PRE-CONSTRUCTION FORM WILL BE PROVIDED NEXT WEEK. OK TO GRUB AND BEGIN TRENCH/BERM SWPPP INSTALLATION. |