Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T06BU01321
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/20/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) ENSURE A DESIGNATED CONCRETE/MATERIALS WASH OUT IS INSTALLED PER PLAN WHEN PRACTICABLE. 2) ENSURE STORM WATER MAINT. SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER PLAN. 3) POST A COPY OF YOUR SIGNED NOI AT THE ENTRANCE TO THE SITE. 4) INSTALL A STABILIZED ENTRANCE/SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY. 5) THE LOCATION AND REQUIREMENT FOR A STORM WATER CONTROLS MAY CHANGE THROUGHOUT THE COURSE OF CONSTRUCTION - CALL FOR RE-INSPECTION |
|
09/22/2006 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | MET WITH CONTRACTOR (LLOYD CONSTR), DISCUSSED SWPPP. CONTRACTOR WILL PLACE WADDLE ALONG THE SOUTH PERIMETER, AND NORTH PERIMETER OF THE PROJECT. THERE IS A CURB ALONG THE WEST SIDE OF THE SITE THAT WILL BE USED AS A SEDIMENT TRAP. |