Permit: T06BU01321

Parcel: 11202003D

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
12/20/2006 ENGINEERING PRE-CONSTRUCTION Approved 1) ENSURE A DESIGNATED CONCRETE/MATERIALS WASH OUT IS INSTALLED PER PLAN WHEN PRACTICABLE.
2) ENSURE STORM WATER MAINT. SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER PLAN.
3) POST A COPY OF YOUR SIGNED NOI AT THE ENTRANCE TO THE SITE.
4) INSTALL A STABILIZED ENTRANCE/SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY.
5) THE LOCATION AND REQUIREMENT FOR A STORM WATER CONTROLS MAY CHANGE THROUGHOUT THE COURSE OF CONSTRUCTION - CALL FOR RE-INSPECTION
09/22/2006 ENGINEERING PRE-CONSTRUCTION Not ready for Inspection MET WITH CONTRACTOR (LLOYD CONSTR), DISCUSSED SWPPP.
CONTRACTOR WILL PLACE WADDLE ALONG THE SOUTH PERIMETER, AND NORTH PERIMETER OF THE PROJECT. THERE IS A CURB ALONG THE WEST SIDE OF THE SITE THAT WILL BE USED AS A SEDIMENT TRAP.