Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2005 | PLUMBING - FINAL | Approved | GAS PRESSURE TEST IS OK ALL CORRECTIONS HAVE BEEN MADE OK TO BACKFILL THE TRENCH |
|
| 11/28/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*SHALL PROVIDE AN AIR PRESSURE TEST ON ENTIRE SYSTEM. THERE IS A LEAK @ UNION @ HOUSE CONNECTION. SHALL REMOVE THE FLEX LINE IN T & P DRAIN AND HARD PIPE. THE T & P DRAIN FULL SIZE SHALL REPLACE SHUT OFF VALVE @ GAS PACK ON ROOF SHALL PROVIDE BONDING GROUND WIRE FOR GAS LINE # 6 WIRE MIN. GAS LINE UNDER POOL DECK SHALL REQUIRE SLEEVE AND VENT TAPE TRACER WIRE TO GAS LINE UNDER GROUND. |