Permit: T05PL01882

Parcel: 132102160

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
01/18/2006 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
GAS PRESSURE TEST IS OK - OK TO COVER PIPING IN GROUND
1. PROVIDE BONDING, SEE PREVIOUS NOTES
VENT PIPING ABOVE ENCLOSURE IS OK
2. USE 3" ADJUSTABLE 90 DEG. BETWEEN WATER HEATER AND 3" DOUBLE WALL B VENT
3. SECURE CONNECTIONS WITH SCREWS - NOT TAPE
12/29/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
- PROVIDE BONDING OF GAS LINE THIS CAN BE ACCOMPLISHED BY INSTALLING A GROUND WIRE BETWEEN THE GAS AND WATER PIPING.
- PROVIDE A PRESSURE GAUGE WITH 1/10 POUND INCREMENTATION TEMP & PRESSURE RELIEF SHALL TERMINATE WITHOUT THREADS
WATER HEATER VENT REQUIRES A FLUE COLLAR.
- VENTING OUTSIDE OF ENCLOSURE REQUIRES DOUBLE WALL TYPE B VENT WITH A LISTED CAP.
- VENT SHALL EXTEND IN A GENERALLY VERTICAL DIRECTION WITH OFFSETS NOT EXCEEDING 45 DEG.
- B VENT REQUIRES 1" CLEARANCE FROM COMBUSTIBLES
- APPROVED VENT SUPPORTS DESIGNED FOR USE WITH B VENT REQUIRED. TIE WIRE IS NOT ACCEPTABLE.
- B VENTS TERMINATING LESS THAN 10' FROM THE COOLER ARE REQUIRED TO BE 3' ABOVE COOLER.
- PIPING PENETRATIONS SHALL BE SEALED.
* NOTE: PIPING & VENT INSIDE HOME AT FURNACE IS OK
STOVE IS ELECTRIC
12/19/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
12/12/2005 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. PE YARD PIPING REQUIRED TO HAVE MIN. 18" OF COVER
2. GAS INSPECTION SHALL INCLUDE THE ENTIRE SYSTEM
3. CONNECT YARD PIPING TO HOUSE. PRESSURE TEST.
4. WATER HEATER SHALL BE INSTALLED ON A CONCRETE OR OTHER APPROVED BASE, EXTENDING 3" ABOVE GROUND LEVEL. ALSO, WH SHALL BE PROTECTED BY A WEATHERPROOF ENCLOSURE AND SHALL HAVE A MIN 5' OF FLUE PIPING.
5. ACCESS TO OTHER GAS APPLIANCES IS REQUIRED FOR INSPECTION
6. BONDING OF GAS LINE REQUIRED
12/08/2005 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*