Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE TEST GAUGE 1/10 PSI INCREMENTATION START TEST AT METER 2. COMPLETE LIST FROM 10/21/05 |
|
| 10/21/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES AND COUPLINGS SHALL BE USED 2) PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES WITH APPROVED GAS FLEXES 3) VENT FROM WATER HEATER TO BE DBL WALL THRU CEILING AND ROOF WITH APPROVED FLASHING TERMINATING 1' ABOVE ROOF MINIMUM WITH APPROVED VENT CAP 4) PROVIDE UPPER AND LOWER COMBUSTION AIR OPENINGS WITH LOUVERS MINIMUM 100 SQUARE INCHES EACH 5) CORRECT LOWER COMBUSTION AIR FOR FURNACE IN LOWER UNIT 6) PROVIDE 3-GALV SCREWS AT EACH JOINT OF APPLIANCE VENT PIPING 7) PROVIDE UPPER COMBUSTION AIR OF 100 SQUARE INCHES FOR FURNACE IN UPPER UNIT 8) PROVIDE BONDING OF BLDG GAS PIPING 9) YOU GAS PIPING IS UNDER SIZED FROM METER TO APPLIANCES. PROVIDE CITY APPROVED GAS ISOMETRIC PLAN WITH DISTANCES AND BTU REQUIREMENTS |