Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE BONDING OF BLDG GAS PIPING 2) WATER HEATER TEMPERATURE AND PRESSURE RELIEF PIPING TO BE RIDGID APPROVED MATERIAL GRAVITY DRAIN TO DAYLIGHT TERMINATING 90 DEGREE DOWN 6"-24" FROM FINISH GRADE 3) VENT FROM WATER HEATER TO BE 3' ABOVE TOP OF INTAKE FROM COOLER WHEN WITHIN 10' OF INTAKE WITH APPROVED VENT MATERIAL |