Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* NOT READY 1. PROVIDE BONDING OF BUILDING GAS PIPING. 2) VENT FROM WATER HEATER TO BE 3', VENT FROM FURNACE TO BE 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE. |