Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T05EL01658
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/02/2007 | ELECTRIC - FINAL | Approved | APPROVED ON T05CM04475 PER STEVE LONG | |
08/15/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) LINE LOAD CONDUCTORS IN SAME RACEWAY OR GUTTER, UNPROTECTED UTILITY AND CUSTOMER 230.7 NEC 2) LOAD CONDUCTORS TO MODULAR OFFICE NOT PROTECTED PROPERLY 3) CT AND METER SEALED WITH TEP SEALS 4) VERIFY SYSTEM IS GROUNDED PER 250 NEC COULD NOT VERIFY EARTH GROUND OR BLDG STEEL 5) CONTRACTOR NOT ON SITE, OPEN CT AND GUTTER VERIFY NEUTRAL BONDED, BOND BUSHINGS OR BOND LOCK NUTS INSTALLED 6) NEUTRAL CONDUCTOR NOT RUN TO MAIN DISCONNECT PER 250 NEC |