Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2007 | ENGINEERING - FINAL | Approved | C Of O Approved | |
| 09/06/2006 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMPORARY C OF O. 1. CORRECT DRAINAGE PROBLEMS AROUND THIS BUILDING. 2. RE-INSTALL ROCK RIP RAP AT DRAINAGE INLETS AND OUTLETS. |