| 07/12/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/31/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CLOSET FLANGES NOT SET. FLANGES SHALL BE FASTENED TO FLOOR. RE-CALL INTERMEDIATE WHEN READY FOR CLOSET FLANGE INSPECTION. RECALL HCS AFTER OBTAINING JOINT SEWER AGREEMENT. |
|
| 05/30/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* - PROVIDE DOCUMENTATION FOR THE USE OF PEX OVER COPPER TUBING. - PROVIDE 18" OF COPPER BETWEEN SWEAT VALVES & FLEXES AND PEX TUBING. - PROVIDE PROTECTION OF PEX PASSING THRU METAL STUDS. - A DOUBLE SANTEE IS NOT ACCEPTABLE AS A DOUBLE FIXTURE FITTING. OVERSIZING OF SANTEE IS FOR BRANCH CONNECTIONS ONLY. SEE UPC ILLUSTRATED TRAINING MANUAL FOR FURTHER EXPLANATION. - PROVIDE DOUBLE FIXTURE FITTINGS AT LAVS. - SUPPORT HORIZONTAL WASTE AT LAV OFFSET. - PROVIDE TEST ON TUB OVERFLOW CONNECTION BEFORE CONCEALING. - RED LINE PLAN TO SHOW THAT THERE IS NO GAS PIPING. - GAS FOR GAS INSPECTION TO CLEAR. |
|
| 05/26/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* GATE LOCKED PROVIDE ACCESS |