Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 12/09/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WASTE IN BUILDING OK - CALL FOR WRAPS BEFORE CONCRETE WATER PIPE TO BE ON PLAN - CLEANOUTS |
|
| 12/07/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. TEST WYG ON BUILDING SEWER MUST BE INSTALLED IN THE CORRECT DIRECTION OF FLOW. 2. CHECK GRADE - 2% SLOPE REQUIRED ON HORIZONTAL WASTE PIPING. 3. SHADE/SUPPORT ALL SECTIONS OF PIPING - LEAVE FITTINGS EXPOSED TO CHECK FOR LEAKS. 4. WATER TEST NOT HOLDING AT 10' HEAD 5. WATER PIPING NOT ACCORDING TO PRINT |