Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2006 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 05/26/2006 | ROOF NAILING | Partial Approval | IVRS - Inspection :* | |
| 05/25/2006 | ROOF NAILING | Partial Approval | IVRS - Inspection :* OK TO DRY IN |
|
| 05/24/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. MISSING MANY, MANY ANCHOR BOLTS AT TOP PLATE. 2. X-BRACES REQUIRE EVERY 25' MAX. 3. ENGINEER STIPULATES ALL OF ROOF ASSEMBLY TO BE DESIGNED BY TRUSS MANUFACTURER. THERE ARE NOT DETAILS FOR HOLDDOWNS (H.3 CLIPS) NOR ANY POSSIBLE SHEAR NAILING @ EDGES. PROVIDE C.O.T APPROVED ROOF ASSEMBLY DRAWINGS. 4. YOUR FREEZE BOARDS TO NOT MATCH PLAN 4/D3 |