Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T05CM05898
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/12/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
12/07/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE A WATER TEST ON DWV SYSTEM ALL THE WAY TO THE TOP OF VENT THRU ROOF. 2. SHALL PROVIDE L-SWEEPS FOR ALL VERTICAL TO HORIZONTAL DRAINAGE. 3. SHALL PROVIDE APPROVED HANGERS FOR HORIZONTAL VENT ABOVE CEILING. 4. SHALL REMOVE FERNCO COUPLINGS AT EXISTING BUILDING DRAIN AND PROVIDE SHIELDED MISSION COUPLINGS. 5. SHALL LOCATE THE RE VENT FOR LAV & SINK MIN 6" ABOVE THE FLOOD RIM LEVEL. 6. SHALL LOCATE C.O. ABOVE THE WATER CLOSET TANK & GRAP BARS FOR MIN OF 18" FRONTAL CLEARANCE. |