Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2007 | ENGINEERING - FINAL | Approved | ||
| 05/25/2007 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMPORARY C OF O 1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T05BU02585 IS COMPLETED AND APPROVED. 2. REPAIR BROKEN SIDEWALK AT REAR OF PROJECT 3. PROVIDE SIDEWALK SCUPPERS ACROSS WALKWAYS ON LINEAR PARK. SEE GENERAL GRADING NOTE #17, PAGE I OF THE GRADING PLAN. 4. PROVIDE CONCRETE PORKCHOP AND BULLNOSE AT EAST DRIVEWAY ENTRANCE TO SPEEDWAY. |
|
| 02/27/2007 | ENGINEERING - FINAL | Denied | 1. PROVIDE A LETTER OF CERTIFICATION FROM THE AZ REGISTERED P.E. THAT CERTIFYS THAT THE PROJECT WAS CONSTRUCTEDTO THE C.O.T. APPROVED PLANS AND THAT THE DRAINAGE AND R/D BASIN WILL FUNCTION AS DESIGNED. NOTE: THE ENGINEER MUST PROVIDE SPECIFICS AND OUTFALL INFORMATION TO THE C.O.T. ENGINEER FOR APPROVAL, THE STORMWATER HARVEST BASIN AT THE N.E. CORNER OF THE BUILDING. 2. COMPLETE ALL SITE WORK. 3. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. |