Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2007 | ENGINEERING - FINAL | Approved | ||
| 07/09/2007 | ENGINEERING - FINAL | Partial Approval | SOME SANDBLASTING STILL TAKING PLACE ALONG THE NORTH SIDE OF THE BLDG. OK FOR TEMP C OF O FOR ENGINEERING AS LONG AS: 1) CONSTRUCTION ACTIVITIES ARE SEPARATED FROM PUBLIC ACCESS. 2) ALL CONSTRUCTION DEBRIS AND MATERIALS ARE CLEANED UP AND REMOVED AT THE END OF EACH DAY. NOTE: DO NOT WASH OUT PAINT BRUSHES AND ROLLERS IN THE GUTTER. |
|
| 07/03/2007 | ENGINEERING - FINAL | Not ready for Inspection | NOT READY, CALL FOR RE-INSPECTION |