Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/22/2008 | PLUMBING - FINAL | Approved | ||
| 01/09/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. HAVE REVISED APPROVED PLAN ON SITE 2. I CANNOT TELL WHAT CHANGES HAVE BEEN INCORPORATED INTO THE REVISED PLAN WITHOUT COMPARING IT TO THE ORIGINAL REDLINED PLAN 3. WHERE ARE YOUR ORIGINAL RED LINE DRAWINGS AS DRAWN BY GARY THOMPSON. THESE ORIGINAL RED LINES ARE ESSENTIAL TO DETERMINING THE EXTENT OF CHANGED WORK CONTRACTOR TO PAY REINSPECTION FEE |
|
| 12/31/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* WHERE ARE YOUR ORIGINAL RED LINE DRAWINGS AS DRAWN BY GARY THOMPSON. THESE ORIGINAL RED LINES ARE ESSENTIAL TO DETERMINING THE EXTENT OF CHANGED WORK CONTRACTOR TO PAY REINSPECTION FEE |
|
| 12/28/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* I CANNOT TELL WHAT CHANGES HAVE BEEN INCORPORATED INTO THE REVISED PLAN WITHOUT COMPARING IT TO THE ORIGINAL REDLINED PLAN |
|
| 12/27/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/09/2007 | PLUMBING - FINAL | Partial Approval | PENDING AS-BUILT PLAN APPROVAL STILL REQUIRE REVISED APPROVED PLAN PLUMBING FINAL OK SUBJECT TO APPROVED PLAN STILL LOOKING FOR TEMP C OF O 1. PLEASE COMPLETE ALL ITEMS BEFORE CALLING FINAL HAVE REVISED APPROVED PLAN ON SITE CONTINUED "NOT READYS" WILL RESULT IN A REINSPECTION FEE |
|
| 07/05/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CONDENSATE DRAINS MAY BE TIED TOGETHER WHEN SIZED PROPERLY 2. INDIRECT WASTES MAY NOT BE TIED TOGETHER I.E DRAIN FOR RPPBP, TANK DRAINS, ETC 3. INSTALL COUNTER SUNK TAPPED CLEANOUT PLUGS AT ALL CLEANOUT AND LEAVE COVERS OFF 4. SUMP PUMP INCOMPLETE 5. TEMPERING VALVES AT PUBLIC USE LAVATORIES 6. GRATES AND STRAINERS INSPECTION STOPPED - CONTRACTOR REQUESTS TEMP C OF O |
|
| 07/03/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |