| 05/22/2007 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/04/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* PARTIAL OK PNL LIA OK --- OK TO ENERGIZE TRAN C2 OK -- OK TO ENERGIZE TRAN T1 OK -- OK TO ENERGIZE PNL PIA, PIB OK -- OK TO ENERGIZE PNL CPIA OK -- OK TO ENERGIZE |
|
| 04/23/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* PENTHOUSE OK 1. PH GUTTER OK 2. PH TRANS OK 3. 60A DISC VFD OK -- NEED TO SEPARATE 4-6 CONDUCTORS 4. 30A DISC VFD OK -- NEED TO SEPARATE 4-6 CONDUCTORS 5. 30A CW PUMP DISC OK WP-OK 6. 30A HW PUMP DISC OK HW OK 7. PH PNL OK ELEVATOR ROOM - OK 1. 60A DISC OK -- MUST LABEL & INSTALL GRD BUSHING PRIMARY. 2. TRANS (STRAP CW BOND IN PH) OK - LABEL MOVE GRD ON BUSHING IN TRANS 2" FLEX TO BOTTOM SCREW |
|
| 04/13/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PARTIAL INTERMEDIATE - 1ST FLOOR ENTRY, SPECIAL SERVICES, RM 102 2. PNL L2A AT SWGEAR (MAIN) CB ON TERM OK GRD OK 3. 2ND FLOOR PNL L2A, PNL OK TER OK GRD OK 4. T-2 TRANS OK -- GRD TO SW GEAR GRD OK 5. PNL 2PA OK -- TRANS C-1 (CLEAR POWER) OK 6. PNL CP2A OK 7. 3/0 CU GRD FROM 2ND FL TRANS TO SW GEAR OK TO ENERGIZE 2ND FLOOR |
|
| 04/06/2007 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) REVIEW FAN MOTORS BELOW FLOOR IF 1/8 HP IT ? 2) REVIEW ELEVATOR ROOM FOR LOCATION OF 45 KWA TRANS. |
|
| 04/05/2007 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 04/03/2007 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* MEETING WAS SET UP TO DISCUSS ELEVATOR RM CLEARANCES FOR ELECTRICAL EQUIPMENT, CONTRACTOR COULD NOT MAKE MEETING. |
|
| 03/28/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* BASEMENT WALLS OK |
|
| 03/22/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 3RD & 4TH FLOOR CONDUITS UNDER RAISED FLOOR OK ELECTRICAL CONDUITS ONLY |
|
| 01/23/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* INSPECTION FOR SERVICE SECONDARY CONDUCTORS OK TO COVER RACEWAYS IN STAIR AREA. BUILDING LINE TO TRANSFORMER WILL NEED CONCRETE ENCASEMENT PER NEC 300.5 NOTE 5 IF 18" OF COVER CAN'T BE OBTAINED, CALL FOR INSPECTION OF RACEWAYS. IN THIS AREA AFTER CONCRETE ENCASEMENT. ALONG THE ENTIRE LENGTH OF SERVICE TRENCH, A WARNING RIBBON IS TO BE INSTALLED PER NEC 300.5 D3 |
|
| 01/22/2007 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK TO COVER ELECTRICAL IN WALLS FOR FLOORS #1 THROUGH #4 ALSO, OK HARD LID COVER IN BATHROOMS FOR THESE AREAS |
|
| 12/29/2006 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) MAKE SURE BOXES ARE PROPERLY MOUNTED-NEC 314.23 B1 2) MAKE SURE EMT PROPERLY SECURED/SUPPORTED-NEC 358.30 AND MAXIMUM 360 DEGREE IN BENDS NEC 358.26 3) PULL BOX SIZE INFORMATION-NEC 314.28 4) GUTTER CONDUCTOR DERATION INFORMATION-NEC 366.6/366.7 5) OK RESTROOM COVER 2ND THRU 4TH FLOORS |
|
| 10/30/2006 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK TO COVER INTERIOR UNDERGROUND PORTION OF PHONE BOOTH/L.V RUN, STUB TO EXTERIOR OF BUILDING. |