Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2007 | FRAMING | Approved | IVRS - Inspection :* | |
| 04/19/2007 | FRAMING | Partial Approval | IVRS - Inspection :* PROGRESS ON FIRESTOP OK |
|
| 04/17/2007 | FRAMING | Partial Approval | IVRS - Inspection :* BASEMENT FRAMING OK/SPECIAL SERVICES 102 OK |
|
| 03/28/2007 | FRAMING | Partial Approval | IVRS - Inspection :* DO NOT TAPE RATED WALLS UNTIL FIRESTOP HAS BEEN INSPECTED |
|
| 02/27/2007 | FRAMING | Not ready for Inspection | IVRS - Inspection :* JUSTIFY CEILING GRID TIES AT MORE THAN 4' O.C |
|
| 02/21/2007 | FRAMING | Partial Approval | IVRS - Inspection :* PROGRESS OK |
|
| 01/23/2007 | FRAMING | Partial Approval | IVRS - Inspection :* A. NE STAIR WALL - REDLINE PLAN FOR FRAME INSTEAD OF MASONRY (EXISTING). B. PACK ELECTRIC CHASE @ WEST SIDE EACH FLOOR WITH SUITABLE FIRESTOP BEFORE COVERING. HARD LIDS/WALLS 1ST FLOOR OK HARD LIDS/WALLS 2ND FLOOR OK - PLENUM NOT FRAMED WALLS 3RD FLOOR OK - HARD LIDS OK WALLS/HARD LIDS 4TH FLOOR OK - SOUTH SOFFIT NOT IN |
|
| 01/22/2007 | FRAMING | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 12/07/2006 | FRAMING | Partial Approval | IVRS - Inspection :* 1. OK TO 1 SIDE ALL CFS FRAMING. 2. PROVIDE SLIP JOINT AT HEAD OF WALLS PER DISCUSSION/PLAN REQUIREMENTS. 3. MID-SPAN BRIDGING REQUIRED. |
|
| 11/28/2006 | FRAMING | Partial Approval | IVRS - Inspection :* PARAPET FRAME @ LINTEL EAST SOFFIT OK TO COVER |
|
| 11/22/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) SITE LOCKED 3:30 PM |