Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T05CM05315
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/31/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS MADE OK OK FOR C OF O S.T.O.I |
|
01/30/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SEE NOTE #1 FROM 1/26/07 2. PROVIDE NSF LISTING FOR HOSE SUPPLY |
|
01/29/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* YOU BEEN TOLD THREE TIMES THAT A 1/2" I.D BACKFLOW DEVICE REQUIRES 1/2" I.D SUPPLY REDUCING EACH SIDE OF THE DEVICE IS NOT ACCEPTABLE INSTALL FULL 1/2" SUPPLY TO THE DEVICE ON THE OUTLET SIDE YOU MAY REDUCE TO 3/8" CONTRACTOR TO PAY REINSPECTION FEE |
|
01/26/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. DOUBLE WYE MAY NOT BE INSTALLED IN THE HORIZONTAL POSITION. 2. 1/2" RIPS BACKFLOW DEVICES REQUIRE FULL 1/2" SUPPLY |
|
01/24/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. INSULATION ON TEPID WATER TO HOSE REEL AND RPBFP OK 2. URINAL LOWERED TO ADA HEIGHT OK - SUBJECT TO BLDG. INSP. 3. DO NOT CALL FINAL UNTIL IT IS READY. |
|
01/23/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* INSTALL THE INSULATION IN A WORKMANSHIP LIKE MANNER CONFORMING TO INSTALLATION STANDARD. |
|
01/18/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* HOSE REEL WILL REQUIRE BACKFLOW PROTECTION = POLLUTION |
|
01/12/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. A GAS CARD MAY BE LEFT WHEN CONTRACTOR POSTS A BOND, AND ALL OTHER REQUIRED INSPECTIONS HAVE BEEN APPROVED. 2. CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS THIS INCLUDES ALL REQUIRED PAPERWORK. NOT BEING READY WILL CAST YOU A REINSPECTION FEE. 3. I HAVE MENTIONED SEVERAL TIMES BEFORE - THE PLUMBER MUST INSTALL PER PLAN. |
|
01/11/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* (REQ. GAS CLEARANCE) 1. NEED SAFETY CABLES INSTALLED ON ROLLING GAS APPLIANCES. 2. NEED OK FROM MECH. INSPECTOR AND ALL APPLIANCES INSTALLED FOR GAS SERVICE. |