Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T05CM05315
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/24/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
01/23/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
01/19/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE INSPECTION HISTORY FOR SEWER 2. PROVIDE INSPECTION HISTORY FOR GAS NOTE: I DO NOT HAVE TIME TO ORGANIZE YOUR PAPERWORK PLEASE HAVE ALL NECESSARY PAPERWORK READILY AVAILABLE AT TIME OF INSPECTION. 3. REVISED PLAN ON SITE 03005 ROUGH APP 4. GAS PRESSURE TEST OK LEFT GAS CARD SW GAS 889-1888 |
|
11/15/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* INSTALL GLASS FIBER INSULATION WITH ASJ (LIKE THE REST) ON HOT WATER SYSTEM. |
|
11/14/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PLUMBING MODIFICATION REDLINED ON PLAN WILL REQUIRE A REVIEW AND REVISED PLAN. 2. 1/4 BEND NEEDS TO BE A SWEEP 3. INSULATE HOT WATER PIPING 4. REQUIRE REVISED PLAN FOR REDLINED UNDERGROUND. |
|
10/19/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CORRECTIONS MADE OK OK TO COVER ALL AREAS |
|
10/16/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. ALL PIPING PASSING THRU MASONRY TO BE WRAPPED. 2. ABS NOT APPROVED IN EXPOSED EXTERIOR LOCATION (G.I VENT) 3. ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN FOUR FEET BETWEEN HANGERS. 4. SCREW DOWN CLOSET FLANGES. 5. TEST DOMESTIC WATER PIPING TO 100# FOR 24 HRS. |
|
10/15/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PLAN CALLS FOR 2" RPA 2. ABS MAY NOT BE DIRECTLY EMBEDDED IN MASONRY. 3. OVERHEAD ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES THEN NO MORE THAN 4' BETWEEN HANGERS. SCREW DOWN FLANGES. |
|
10/04/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. WELD PIPE REQUIRES 60# TEST 2. NO RPPBP INSTALLED -- TEMP HOSE BIBBS TO HAVE VACUUM BREAKERS. 3. ROOF DRAINS WATER TEST OK 4. PLUMBING IS TO BE INSTALLED IN A WORKMANSHIP LIKE MANNER TO ACCEPTABLE ENGINEERING PRACTICES AND PER THE APPROVAL PLAN. CHANGES ARE TO BE ACCOMPANIED WITH AT LEAST REDLINES. 5. READ PLUMBING PLAN NOTES -- THEY WILL BE ENFORCED. |