Permit: T05CM04691

Parcel: 130010050


Addresses:

2965 E FAIRLAND SV


Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T05CM04691

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
12/12/2006 ENGINEERING - FINAL Approved Contractor completed outstanding items.
11/09/2006 ENGINEERING - FINAL Partial Approval OK FOR TEMPORARY C OF O.
1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR T05BU02254 IS COMPLETED AND APPROVED.
2. COMPLETE ALL PUNCHLIST ITEMS LISTED ON 10-31-06 INSPECTION REPORT.
10/31/2006 ENGINEERING - FINAL Denied Contractor needs to:
1- Stabilize slope bank south side of project.
2- Provide letter from engineer in regards to Drainage ways, Per chapter XIV, section 14.2 (7).
3- Grade basin to drain.
4- Stabilize all areas disturbed by construction.
5- Address erosion around south basin.
6- Complete all drainage southwest corner of project.
7- Backfill all open holes.
8- Separate all construction materials from public access.
9- Install bollards in trash enclosure. Per DS, 6-01.
10- Remove construction trailers from site.
11- Stabilize slope bank northeast corner of project.
12- Complete all work north side of building.
13- Replace all broken wheel stops.
14- Complete sidewalk southeast corner of project.
15- Install trucated domes on sidewalk southeast corner of project.
16- Install header on HC ramp.
17- Install scupper southeast corner of building.
Contractor needs to complete all work. This is not a complete punch list.