Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* VACUUM TEST ON MANHOLE #3 APPROVED TEST OK |
|
| 11/15/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* VACUUM TEST FOR MANHOLE #1 #2 & #3 1. MANHOLE #1 APPROVED TEST OK 2. MANHOLE #2 APPROVED TEST OK 3. MANHOLE #3 NR TEST NOT HOLDING |
|
| 11/13/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PROVIDE VACUUM TEST ON MANHOLE #1, #2 AND #3 |
|
| 10/31/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* DIVERSIFIED & CXT HAVE BEEN ADVISED TO OBTAIN STATE BOILER INSPECTIONS FOR BOILING AND GAS SYSTEM TO BE ENERGIZED. ALSO, BOTH HAVE BEEN ADVISED PROPER POTABLE BACKFLOW PERFECTION WITH C OF O SHALL BE OBTAINED TO OPERATE BATCH PLANT. (YARDWATER SEE NOTE FROM 9/27/06) PROVIDE PERMITS AND INSPECTION FOR BOILER THAT IS ON SITE. |
|
| 08/31/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. RESTROOMS OK LOCKER ROOMS 2. BREAKER ROOM OK 3. JAN. ROOM OK 4. FIRST AID ROOM OK 5. WATER HEATERS OK 6. LAB SINK IN ROOM OK |