Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: SITE - SEWER
Permit Number - T05CM04691
Inspection Description - SITE - SEWER
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/16/2006 | SITE - SEWER | Approved | IVRS - Inspection :* | |
11/15/2006 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
11/08/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
11/07/2006 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* | |
11/06/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* 1. FROM MANHOLE IN STREET TO MANHOLE #1 PIPING IN 2. PROVIDE TEST FROM HOLE IN STREET TO MANHOLE #1 ON PIPING. |
|
11/03/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
11/02/2006 | SITE - SEWER | Not ready for Inspection | IVRS - Inspection :* 1) SITE SEWER IS IN PARTIAL STATE TO BE COMPLETED PENDING, NO SEWER FACILITIES TO BLDG AT THIS TIME 2) VACUUM TEST REQUIRED ON ALL MANHOLES TESTING REQUIRED FROM MANHOLE AT WEST END TO PUBLIC MANHOLE, WITH VERIFICATION OF GRADE |
|
06/06/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* FROM MANHOLE #1 THRU MANHOLE #3 PIPING LAYED BUT NOT TESTED. CALL FOR INSPECTION FOR MANHOLE BASES WHEN READY. |
|
06/01/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* SITE SEWER INSTALLED FROM MANHOLE #2 THRU COL LINE 26 NOT YET TESTED, NOT CONNECTED TO BRANCH LINES. ATTACH TRACER WIRE TO PIPE PER STAGE STATUE. |
|
05/23/2006 | SITE - SEWER | Partial Approval | IVRS - Inspection :* GREEN TRACER WIRE REQUIRED ON NON-METALLIC PIPING 8" SDR BETWEEN PRIVATE MANHOLE #1 AND #2 |