11/03/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* SITE SEWER FROM PUBLIC MANHOLE 21' OF DUCTILE IRON INSTALLED. |
|
10/09/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
08/03/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
07/18/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PRE-SLAB FOR FLOOR SINKS & DRAIN |
|
07/13/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | 1. 03057 -- SITE SEWER REQUIRES PCDEQ INVOLVEMENT, SHALL HAVE THERE STAMPED APPROVED PLAN WITH CITY APPROVAL ON PLAN ON SITE. THIS SHALL HAVE AUTHORIZATION FOR CONSTUCTION & FOR COMPLETION, AUTHORIZATION TO DISCHARGE. CITY INSPECTORS & INDEPENDENT INSPECTORS BOTH SHALL INSPECT SITE SEWER. 2. DEW 100 PSI TEST 4" PER REDLINE DRAWN ON SITE NEED REVISED CITY APPROVED PLANS. 3. PROCESS PIPING 2 - 2" STEEL 100 PSI TEST (BINS PIPE) (PLANT PIPE) 1 - 1 1/2" 100 PSI TEST (SAW PIPE) 1 - 4" 100 PSI TEST (BATCH PIPE) 4. NEED TO SEE PIPE MATERIAL TYPE FROM ENGINEER FOR PROCESS PIPING. |
|
06/09/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* BUILDING DRAIN CONNECTIONS TO SEWER OK TO COVER CLOSET FLANGES EAST RESTROOMS OK |
|
06/08/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 3" CAST IRON FROM COL. B TO SUMP PP501 - OK 2" CARBON STEEL PUMP DISCHARGE TO SETTLEMENT POND OK PROVIDE STAMPED LETTER FROM ENGINEER CONFIRMING MATERIAL TYPE. |
|
05/12/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* THIS IS A BELOW SLAB WATER PIPING INSPECTION. 1 1/2" COPPER W/BRAZED JOINTS AND 1 1/2 BLACK STEEL PIPING INSTALLED ALONG COL X2 AND BETWEEN COL. 27-30 THIS IS PROCESS PIPING - PROCESS PIPING IS TO BE INSPECTED BY MECHANICAL INSPECTOR. PROVIDE DOCUMENTATION FOR MATERIAL TYPE. |
|
05/09/2006 | PLUMBING - ROUGH, SOIL | Cancelled | CANCELLED PER FRED | |
05/05/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 3 FDS OK |
|
04/24/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* PRE-SLAB INSPECTION OK PROTECT + LEVEL FDS NOTE: MAIN WASTE LINE OUTSIDE OF SLAB HAS NOT YET BEEN INSPECTED. |
|
04/10/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* FLOOR DRAIN AT COL. 19 AND FLOOR SINK AT COL. 16 OK |
|
04/03/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* DWV BELOW GRADE W/10' WATER TEST OK CALL FOR PIPE WRAP INSPECTION AND TRAP PRIMERS |