Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T05CM04672
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*I NEED TO SEE THE BOND BETWEEN GAS AND WATER PAINT VENT TERMINARS BREAK OFF AIB RETAINING SCREW ADA WATER CLOSET-FLUSH HANDLE ON WIDE SID E WASHER BOX TRIM. |
|
12/19/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :**PLBG FINAL IS OK OK FOR C OF O |
|
12/16/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*ALL EXPOSED EXTERIOR WATER PIPING REQUIRES PROTECTION AGAINST THERMAL EXPANSION HOSE BIBS REQUIRE AVB'S INSTALL ALL TRIM, COVERS, PLATES, ETC. CAPPED OFF PIPING INTERFERES WITH OPENING OF CABINET DOOR. INSPECTION STOPPED. |
|
12/12/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*SHALL PROVIDE PERM CAPS ON ALL FUTURE DRAIN THAT ARE STUBBED OUT OF WALL. SHALL PROVIDE AN EXPANSION TANK @ WATER HEATER AND STRAP IT DOWN TO WALL. |