Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* RECEIVED (2) IN HOUSE BACKFLOW CERTIFICATIONS (1) FOR ICE MAKER (1) FOR CARBONATOR (ONLY) |
|
| 05/31/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* FLUSH CAP URINAL TO AVOID HAZARD. SEE NOTE #5 |
|
| 05/25/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE VACUUM BREAKERS AT THE HOSE BIB LOCATIONS. 2. CAP URINAL PIPING AND REMOVE OR HAVE CORRECT INSTALL WITH THIS FIXTURE REFLECTED ON APPROVED PLAN. 3. HAVE SODA DISPENSING EQUIPMENT INSTALLED AND PROVIDE BACKFLOW CERTIFICATIONS. 4. SERVICE EXPANSION TANK. 5. SEPARATE ICE BIN DRAIN FROM MAKER DRAIN AND PROVIDE FULL SIZE BIN DRAIN. |