Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2007 | ENGINEERING - FINAL | Approved | Contractor provided all approved paper work for project, per Patricia Gilbert. | |
| 12/13/2006 | ENGINEERING - FINAL | Denied | Contractor needs to supply approved reviesed drawing. Contractor provided new perk test info. | |
| 12/12/2006 | ENGINEERING - FINAL | Cancelled | IVRS - RI canceled | |
| 06/02/2006 | ENGINEERING - FINAL | Denied | Contractor needs to address: 1- Install HC ramp per city of Tucson standards. 2- Install all fencing, per site plan. 3- Complete all striping. 4- Scupper all downspouts under new sidewalk eastside existing building. 5- Have engineer address basin size. Not per approved plan. 6- Install safety barrier around basin. 7- Backfill all open holes. 8- Stabilize all area distrubed by construction activity. 9- clean parking lot. 10- Seperate all construction material from public access. 11- Provide letter from engineer in regards to drainage and basin. Per City of Tucson Standards. |