Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 11/06/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. TUB IN UNIT #2 HOLDING WATER. 2. RECALL 03035 AFTER WEDNESDAY 11/18/06 |
|
| 10/24/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. UNIT #2 AIR TEST OK OK TO COVER |
|
| 10/20/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* UNIT #1 TUB HOLDING WATER FOR TEST OK UNIT #2 PRESSURE TEST NOT HOLDING |
|
| 10/19/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* USE A 15 PSI GAUGE WITH 1/10TH PSI INCREMENTATIONS FOR A 5 PSI TEST. A 100 PSI GAUGE WILL NOT WORK FOR THIS TEST. VERTICAL TO HORIZONTAL CHANGE OF DIRECTIONS SHALL BE A WYE PATTERN FITTING OR SWEEP OF EQUIVALENT RADIUS. GALV 2 HOLE STRAPS REQUIRED TO SUPPORT PIPING. |
|
| 10/19/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* ERIC 406-2601 AFTER HRS. INSPECTION PAID W/CHECK #3502 UNIT #1 ON EAST SIDE AIR TEST ON ROUGH AND INTERMEDIATE IS HOLDING AT 5 PSI. OK TO COVER THIS UNIT ONLY. PROVIDE WATER TEST ON TUB WASTE AND OVERFLOW. UNIT #2 ON WEST HALF OF BUILDING IS NOT HOLDING AN AIR TEST. LOCATE AND CORRECT LEAK. SYSTEM SHALL BE UNDER TEST PRIOR TO INSPECTION. |
|
| 10/18/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* WEST UNIT, YOU MAY COVER KIT PROVIDED THAT YOU PROVIDE AN AIR TEST. NEATLY WRAP PIPING TO BE IN CONCRETE |
|
| 09/19/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* EAST UNIT KIT. WALL, AND BED RM WALL W/T&P OK TO COVER ONLY CLEANOUT EXTENSIONS ON 2" PIPING REQUIRE WYE PATTERN SWEEPS. SUPPORT HORIZONTAL PIPING W/TWO HOLE STRAPS. |
|
| 09/06/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL CLEANOUTS PER PLAN PROVIDE WYE PATTERN FITTINGS ON CLEANOUTS AND HORIZONTAL CHANGES OF DIRECTION. SECURE DWV. SECURE CU DROP FAR ELLS. ISOLATE CU FROM METAL CONDUIT, TIE WIRE AND NO PLUMBERS TAPE. INSTALL SAFETY PLATES WATER TEST TUB WASTE & OVERFLOW 50 PSI ON TYPE L COPPER |
|
| 08/07/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* CANNOT INSPECT INTERMEDIATE UNTIL AFTER INSPECTING ROUGH PLUMBING. EXPOSE UNDERSLAB PLUMBING AS DIRECTED AT PREVIOUS INSPECTION. PRESSURE TEST, CALL FOR 03005 |
|
| 04/20/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |