Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2006 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* SAW CUT REVEALED HAIRPIN @ INTERIOR COLUMNS |
|
| 04/07/2006 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* REMOVE PORTION OF SLAB. |
|
| 04/06/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STOP WORK LIFTED -- I STILL NEED TO VERIFY |
|
| 03/28/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* DAVID NIES IS NOT LISTED AS AN INSPECTOR IN C.O.T FURTHERMORE HIS INSPECTION LETTERS CONTRADICT THEMSELVES IN WHAT HE ACTUALLY DID. I NEED G.P.R RESULTS FROM A RELIABLE COMPANY & COMPACTION REPORTS. |
|
| 03/24/2006 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 03/15/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. YOU HAVE CONTINUED TO WORK IN VIOLATION OF A STOP WORK ORDER ISSUED ON 1/27/06 2. YOU NEED TO PROVIDE SOILS REPORTS FOR PRE-SLAB. YOU WILL NEED TO HIRE A SPECIAL INSPECTION COMPANY TO X-RAY OR PROVIDE PAHCOMETER TESTS VERIFYING REBAR REPLACEMENT. 3. YOU WILL NEED TO PROVIDE CONCRETE STRENGTH RESULTS 4. YOU WILL NEED TO REMOVE INSULATION IN EXTERIOR WALK SO WE CAN FURTHER EXAMINE WHAT WILL BE REQUIRED FOR YOUR FAILURE TO CALL A LATH INSPECTION. 5. YOU NEED TO GET 01005 & 01015 APPROVED BEFORE ANYTHING ELSE. NOTE: ARCHITECTS, ENGINEERS NOR SPECIAL INSPECTION REPLACES CITY INSPECTION IN ANY WAY SHAPE OR FORM! |
|
| 03/13/2006 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 01/24/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLAN NUMBER ON PLANS DOES NOT MATCH THE PLAN NUMBER ON PERMIT CARD 2) NEED INSPECTION HISTORY/REPORTS FOR EXCAVATION/LAYOUT REBAR AND ZONING (01005) 3) NEED TO ADD BLDG PRE-SLAB AND ROOF NAILING SAME |