Inspection History Details
Permit: T05CM04308
Inspection Status: Approved
Inspection History: PLUMBING - MEDICAL GAS/TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2006 | PLUMBING - MEDICAL GAS/TEST | Approved | IVRS - Inspection :* | |
| 03/02/2006 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 1. PLEASE POST YOUR ADDRESS! 2. MEDICAL GAS PIPING - LABEL & SUPPORTS OK VACUUM PIPING U.G. OK TO COVER SUBJECT TO OTHER INSPECTOR. 3. RECALL AFTER TESTING COMPLETE. |
|
| 02/27/2006 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 1. CONTRACTOR TO VERIFY APPROVAL OF "ZIP STICKS" 2. MED GAS PIPING WALL UNDER WAY 3. RECALL AFTER ALL PIPE INSTALLED AND LABELED BEFORE TESTING. |
|
| 02/02/2006 | PLUMBING - MEDICAL GAS/TEST | Not ready for Inspection | IVRS - Inspection :*PLEASE RE CALL THIS INSPECTION WHEN THE PLUMBER BEGINS HIS PIPING. YOU MAY LEAVE A MESSAGE WITH A NAME AND CONTACT NUMBER / TRAILER LOCKED. | |
| 02/01/2006 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :*CONTRACTOR BEGINNING TO PIPE COMP AIR. RECALL FOR TOMORROW. |
|
| 12/13/2005 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* 1. LEVEL THREE - COMP. AIR - NO SLEEVE REQUIRED VACUUM SCH TO PVC PIPING WRAPPED THROUGH CONCRETE CONTRACTOR TO REALIGN CHANGES FROM THE PLAN OK TO COVER, SUBJECT TO SPECIAL INSPECTOR DON'T FORGET TO SCHEDULE AN INSPECTION WHEN INTERIOR PIPING BEGINS. |