Inspection History Details
Inspection Status: Denied
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2006 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COOLER ENCLOSURES STILL DO NOT HAVE CLEARANCE 2) NEED LETTER OF APPROVAL OR REVISED PLANS FOR VARIATIONS TO RACEWAYS AND FEEDERS 3) MAY OCCUPY FOR TEMPORARY USE |
|
| 01/25/2006 | ELECTRIC - INTERMEDIATE | Approved | ||
| 01/20/2006 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. MAKE CORRECTIONS FROM PREVIOUS INSPECTION 2. OUTLET ENCLOSURES @ COOLERS NEED PROPER WORKING CLEARANCE 3. PROVIDE LETTER FROM ENG. FOR PLAN CHANGES OR WIRE PER PLAN. |
|
| 01/19/2006 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. CORRECTIONS NOT MADE FROM PREVIOUS INSPECTION 2. RE-INSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION. 3. HAVE ELECTRICIAN ON SITE FOR NEXT INSPECTION. |
|
| 01/17/2006 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) PLANS CALL FOR A 4 WIRE FEED TO TRANSFORMER (NEUTRAL PROBABLY TO HELP CLEAR FAULT 2) NEED A SYSTEM BONDING JUMPER EITHER IN TRANSFORMER OR DISCONNECT (INSTALLED AND SIZED CORRECTLY) NEC 250.30 3) GROUND TRANSFORMER TO DISCONNECT IS UNDERSIZED 250.66 4) PANELS A AND B DISCONNECTS SHOULD HAVE NO NEUTRAL TO GROUND CONNECTION NEC 250.142(B) 5) GROUND CRANE DISCONNECT ENCLOSURE 6) USE CORDS LISTED FOR USE AT COOLERS AND INSTALL FUSES 7) BOND COMPRESSED AIR PIPING 8) PLANS SHOW EMT ONLY ABOVE 6' OTHERWISE RIDGID IMC? 9) DURATION OF INSPECTION WILL BE COMPLETED NEXT TRIP |
|
| 12/28/2005 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |