Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2006 | ENGINEERING - FINAL | Approved | DISCUSSED WITH JASON CAGLE AND LEE RAY TRUNCATED DOMES ARE TO BE INSTALLED AT ACCESS RAMP 2' DEEP ALONG ENTIRE LENGTH OF LANDING (5') |
|
| 04/12/2006 | ENGINEERING - FINAL | Partial Approval | -CURBING INSTALLED -ALL MATERIALS, SUPPLIES, PORTA TOILETS IN FENCED CONSTRUCTION YARD -ALL SIDEWALKS INSTALLED -ALL PAVEMENT/ASPHALT IN PLACE 4 H/C PARKING SPOTS INSTALLED AND SIGNED TRUNCATED DOMES NOT YET INSTALLED SITE IS COMPLETE ENOUGH FOR TEMP C OF O IF DEEMED APPROPRIATE BY BUILDING OFFICIAL |
|
| 04/10/2006 | ENGINEERING - FINAL | Partial Approval | -CURBING INSTALLED -ALL MATERIALS, SUPPLIES, PORTA TOILETS IN FENCED CONSTRUCTION YARD -ALL SIDEWALKS INSTALLED -ALL PAVEMENT/ASPHALT IN PLACE 4 H/C PARKING SPOTS INSTALLED AND SIGNED TRUNCATED DOMES NOT YET INSTALLED SITE IS COMPLETE ENOUGH FOR ACCESS |
|
| 03/28/2006 | ENGINEERING - FINAL | Not ready for Inspection | NOT READY CALL FOR RE-INSPECT WHEN ALL SITE WORK IS COMPLETE, ALL CONSTRUCTION DEBRIS IS REMOVED, ROLL OFF AND PORTA TOILETS REMOVED, ALL CONSTRUCTION FENCING IS REMOVED, ALL DRAINAGE AND SPLASH BLOCKS ARE PLACED, ALL PAVING COMPLETE, ETC. |