Permit: T05CM03316

Parcel: 140430130

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
01/05/2007 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
10/03/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NOTE: GRIDLINE 1/K THRU J
K/1 - 1.8
A/1 - 1.4
COLUMN 123 ON GRIDLINE J.1
DETAIL 123 ON SHEET S4.2 FOOTING.

DETAILS: FJ FOUNDATION SCHEDULE ON SHEET S1.4
07/19/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
ALL CALVERT COVER OK TO PLACE
07/10/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
GRIDLINE M AND MID M THRU L LINE 0 THRU 1.8 DETAIL LOG
GRIDLINE H - LINE 1 THRU 3 DETAIL 32
06/07/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SHEET A90, DETAIL 6 & 12,13
* EXISTING EDGE OF CONCRETE TO REMAIN AND INSTALL REBAR CONNECTION REBAR #4 1/2" ZERO 18" @ SIDE.
03/30/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SITE WALL FOOTINGS FROM 1.4 TO 2.7
INCLUDING F2 COL FOOTINGS K2, K2.7 AND J2.7
03/22/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING BY NE CORNER ORIG. BLD ADD VERTS AT EACH CORNER. OK TO PLACE CONCRETE.
02/01/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*FI AND F5 FOOTINS @ SOUTH END OK
TO PALCE WHEN SP. INSP CONFIRMS FINAL STEEL IN SMALL UNFINISHED AREA
01/17/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. HORIZONTAL LAP SPLICES LESS THAN 8' FROM MCJ WILL NOT BE ALLOWED AFTER STEM WALL HEIGHT
01/12/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
2 EACH F-3 FOOTINGS PER CHANGE ORDER WEST WALL OF ELECTRICAL YARD - OK
OK TO PLACE 2 #6 HORIZONTALS TO CONTINUE STEM WALL AND PLACE THAT SECTION OF F1 FOOTING ALSO
12/22/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
PERIMETER PARTIAL
12/22/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PERIMETER & COLPADS OF BLD OK
12/21/2005 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*