Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T05CM03316
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/05/2007 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
10/03/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* NOTE: GRIDLINE 1/K THRU J K/1 - 1.8 A/1 - 1.4 COLUMN 123 ON GRIDLINE J.1 DETAIL 123 ON SHEET S4.2 FOOTING. DETAILS: FJ FOUNDATION SCHEDULE ON SHEET S1.4 |
|
07/19/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ALL CALVERT COVER OK TO PLACE |
|
07/10/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* GRIDLINE M AND MID M THRU L LINE 0 THRU 1.8 DETAIL LOG GRIDLINE H - LINE 1 THRU 3 DETAIL 32 |
|
06/07/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SHEET A90, DETAIL 6 & 12,13 * EXISTING EDGE OF CONCRETE TO REMAIN AND INSTALL REBAR CONNECTION REBAR #4 1/2" ZERO 18" @ SIDE. |
|
03/30/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SITE WALL FOOTINGS FROM 1.4 TO 2.7 INCLUDING F2 COL FOOTINGS K2, K2.7 AND J2.7 |
|
03/22/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING BY NE CORNER ORIG. BLD ADD VERTS AT EACH CORNER. OK TO PLACE CONCRETE. |
|
02/01/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :*FI AND F5 FOOTINS @ SOUTH END OK TO PALCE WHEN SP. INSP CONFIRMS FINAL STEEL IN SMALL UNFINISHED AREA |
|
01/17/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. HORIZONTAL LAP SPLICES LESS THAN 8' FROM MCJ WILL NOT BE ALLOWED AFTER STEM WALL HEIGHT |
|
01/12/2006 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 2 EACH F-3 FOOTINGS PER CHANGE ORDER WEST WALL OF ELECTRICAL YARD - OK OK TO PLACE 2 #6 HORIZONTALS TO CONTINUE STEM WALL AND PLACE THAT SECTION OF F1 FOOTING ALSO |
|
12/22/2005 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PERIMETER PARTIAL |
|
12/22/2005 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PERIMETER & COLPADS OF BLD OK | |
12/21/2005 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* |