Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* PIPING CAPPED AT DF PER PLAN REVISION OF 6/25/07 FUTURE INSTALLATION OF BEVERAGE DISPENSER WILL REQUIRE A PERMIT |
|
| 07/23/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* -- YOU HAVE A TAPPED C O PLUG ALLOWING SEWER GASES INTO BUILDING -- BACKFLOW CERT FOR IRR RECEIVED -- BACKFLOW CERT NEEDED FOR WORK DONE TO SERVICE PROTECTION RP AFTER 5/31/07 -- REVISION OK FOR FUTURE WATER COOLER OK |
|
| 05/31/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL DF RAISE RP DEVICE TO 12" ABV FLOOD LEVEL OF NEW CURB RETEST RP DEVICE INSTALL HB VAC BREAKER AT HB CORRECT PIPING AT IRRIGATION ASSEMBLY PROVIDE CERT. |
|
| 04/10/2007 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* NO PLUMBING PROBLEMS EXIST THAT WOULD PREVENT TCO |
|
| 03/30/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. NOT READY FOR FINAL. 2. NEED TO CLEAR ROUGH SOIL AND SEWER. 3. PROVIDE APPROVED PLAN REVISIONS REQUESTED ON 7/18/06 7/21/06 AND 7/24/06 4. NEED DF INSTALLED FOR FINAL 5. NEED TO INSTALL CLEANOUT SCREW AT MISSING DF PRIOR TO TCO 6. HB VAC BREAKER INSTALLATION |