Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/06/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* REVISED PLAN TO BE CITY APPROVED SHOWING ALL GAS APPLIANCES IN KITCHEN AREA. TEST SHALL HOLD WITH NO PRESSURE LOSS. ALL APPLIANCES TO BE INSTALLED CORRECTLY FOR FINAL. (2) RESTROOMS IN SOUTH ASSEMBLY AREA FUNCTIONAL |
|
| 04/03/2006 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* REVISED APPROVED PLAN ON SITE. 14 PSI AIR TEST FROM METER OVERHEAD TO CAPS AT (2) ROOFTOP UNITS AND TO 1 1/4 SHUT OFF VALVE PRIOR TO ANSUL VALVE - OK 1. NEED TEST ON DOWNSTREAM PIPING OF 1 1/4 VALVE AT ANSUL VALVE AND TO SHUT OFF VALVES ON ROOF. TEST SYSTEM IN ENTIRETY. 2. SECURE GAS PIPING OVERHEAD TO RTU-2 3. PROVIDE BONDING OF GAS PIPING. |
|
| 02/22/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE CITY APPROVED GAS ISOMETER PLAN OF YOUR GAS INSTALLATION. 2. TEST SYSTEM IN ENTIRETY |