Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/22/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PERMANENTLY CAP DRAINS IN COFFEE 10 ROOM 2) PROVIDE VACUUM BREAKERS ON ALL HOSE BIBS 3) PROVIDE 6" MINIMUM FOR CRITICAL LEVEL AT URINALS 4) RECEIVED CLEAN BACTERIA REPORT |
|
| 05/08/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. HAVE APPROVED SITE UTILITY PLAN ON SITE 2. HAVE REVISED APPROVED PLUMBING PLAN ON SITE 3. CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE 4. CLOSET FLANGES OK |
|
| 04/25/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CALL IN ALL INSPECTIONS THAT HAVE NOT BEEN APPROVED PLEASE READ ALL NOTES & COMPLY PROVIDE CLEAN BACTERIA REPORT FOR POTABLE WATER SYSTEM AND CERTIFICATIONS FOR ALL REQUIRED IN HOUSE BACKFLOW DEVICES. DID NOT WALK A FINAL INSPECTION LIST NOT COMPLETE |