Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2008 | ELECTRIC - SERVICE UPGRADE | Approved | IVRS - Inspection :* | |
| 04/08/2008 | ELECTRIC - SERVICE UPGRADE | Partial Approval | IVRS - Inspection :* 1) DO NOT ENERGIZE CIRCUITS BEFORE SAFE TO DO SO |
|
| 04/03/2008 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BONDING CONDUCTORS TO BE SIZED PER NEC 250.102C 2. BOND BUSHING MISSING SCREW - NEC 110.3 B 3. THREDLESS CONNECTORS TO BE ON PIPE, NOT THREADS NEC 110.3B, 250.4 4. TIGHTEN ALL CONNECTIONS 5. USE W.P K.O SEALS 6. GROUNDING ELECTRODE CONDUCTOR TO CONNECT DIRECTLY TO NEUTRAL OR VIA MAIN BONDING JUMPER - 250.24 |
|
| 03/17/2008 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSPECTION AT SERVICE 1. PROVIDE COMPANY LETTERHEAD FOR TORQUE LETTER 2. BOND SERVICE RISERS - NEC 250.92 3. BOND ALL SERVICE RACEWAYS AND ENCLOSURES PEN NEC 250.92 - MYERS TYPE HUB NOT APPROVED BOND PATH 4. SHEETMETAL SCREWS NOT ALLOWED FOR GROUND CONNECTION - NEC 250.8 5. IDENTIFY ALL SERVICE DISCONNECTS - NEC 230.70(B) 6. FEEDER EQUIPMENT GROUNDS UNDERSIZED - NEC 250.122 7. REMOVE PAINT UNDER LUGS - NEC 250.12 8. NEED SEALING TYPE LOCKNUTS FOR ENTRIES ABOVE LIVE PARTS - NEC 312.2 9. PARALLEL CONDUCTORS TO BE PER NEC 310.4 PARTIAL INSPECTION - CORRECTIONS TO NUMEROUS GO THROUGH SERVICE AND BRING TO CODE |