Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2006 | BUILDING ABOVE CEILING | Approved | IVRS - Inspection :* CORRECTIONS COMPLETED FROM INSPECTION OF 8/29/06 |
|
| 08/29/2006 | BUILDING ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* 1. YOU NEED NEW ENGINEERING TO MODIFY PLAN SEE DETAILS 1 & 2 PP. 5-1 NEW ROOF SUPPORTS TO BE AGAINST (FLUSH) METAL ROOF. YOU HAVE CURRENTLY HELD THEM DOWN BECAUSE OF ROOF SHEATHING SCREWS. 2. TO ELIMINATE C-CLAMPS GET LETTER FROM ENGINEER ALLOWING H.S BOLTS 3. RFI WITH ENGINEERS STAMP IS ACCEPTABLE |