Permit: T05CM01898

Parcel: 13819045B

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T05CM01898

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
09/21/2006 ENGINEERING - FINAL Approved Contractor addressed punch list.
09/20/2006 ENGINEERING - FINAL Partial Approval Contractor needs to address items 7 and 11, also submit letter from engineer in regards to drainage and detention basins.
09/11/2006 ENGINEERING - FINAL Partial Approval Contractor needs to address items:
7- Clean Lerdo Rd.
11- Install grouted rip rap. Per detail note #5.
Submit letter from engineer in regards to drainage ways and detention basins. Contractor also needs to address building pads in letter from engineer.
06/16/2006 ENGINEERING - FINAL Partial Approval Contractor needs to close out grading permit and supply letter from engineer in regards to drainage. Contractor to supply letter on 6/19/06. Inspection rescheduled for 6/19/06.
02/15/2006 ENGINEERING - FINAL Partial Approval O.K. for temp C of O with public access. Only good for 90 days.
Contractor addressed items 3 and 4. Still needs to be maintained for safety.
1- Backfill all open holes and trenches or install safety barrier.
2- Add material to north side of wier.
3- Separate all construction activity from public access.
4- Separate all construction material from public access.
5- Complete all grading.
6- Stabilize all areas.
7- Clean Lerdo Rd.
8- Remove ramp and clean up all debri on Lerdo Rd. (for public access)
9- Keep all stormwater controls in place until all areas are stabilized.
10- Complete all basin work.
11- Install grouted rip rap. Per detail note #6.
02/10/2006 ENGINEERING - FINAL Partial Approval O.K. FOR TEMP. NO PUBLIC ACCESS. Only good for 90 days.
Punch list:
1- Backfill all open holes and trenches or install safety barrier.
2- Add material to north side of wier.
3- Separate all construction activity from public access.
4- Separate all construction material from public access.
5- Complete all grading.
6- Stabilize all areas.
7- Clean Lerdo Rd.
8- Remove ramp and clean up all debri on Lerdo Rd. (for public access)
9- Keep all stormwater controls in place until all areas are stabilized.
10- Complete all basin work.
11- Install grouted rip rap. Per detail note #6.