Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T05CM01898
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2006 | ENGINEERING - FINAL | Approved | Contractor addressed punch list. | |
| 09/20/2006 | ENGINEERING - FINAL | Partial Approval | Contractor needs to address items 7 and 11, also submit letter from engineer in regards to drainage and detention basins. | |
| 09/11/2006 | ENGINEERING - FINAL | Partial Approval | Contractor needs to address items: 7- Clean Lerdo Rd. 11- Install grouted rip rap. Per detail note #5. Submit letter from engineer in regards to drainage ways and detention basins. Contractor also needs to address building pads in letter from engineer. |
|
| 06/16/2006 | ENGINEERING - FINAL | Partial Approval | Contractor needs to close out grading permit and supply letter from engineer in regards to drainage. Contractor to supply letter on 6/19/06. Inspection rescheduled for 6/19/06. | |
| 02/15/2006 | ENGINEERING - FINAL | Partial Approval | O.K. for temp C of O with public access. Only good for 90 days. Contractor addressed items 3 and 4. Still needs to be maintained for safety. 1- Backfill all open holes and trenches or install safety barrier. 2- Add material to north side of wier. 3- Separate all construction activity from public access. 4- Separate all construction material from public access. 5- Complete all grading. 6- Stabilize all areas. 7- Clean Lerdo Rd. 8- Remove ramp and clean up all debri on Lerdo Rd. (for public access) 9- Keep all stormwater controls in place until all areas are stabilized. 10- Complete all basin work. 11- Install grouted rip rap. Per detail note #6. |
|
| 02/10/2006 | ENGINEERING - FINAL | Partial Approval | O.K. FOR TEMP. NO PUBLIC ACCESS. Only good for 90 days. Punch list: 1- Backfill all open holes and trenches or install safety barrier. 2- Add material to north side of wier. 3- Separate all construction activity from public access. 4- Separate all construction material from public access. 5- Complete all grading. 6- Stabilize all areas. 7- Clean Lerdo Rd. 8- Remove ramp and clean up all debri on Lerdo Rd. (for public access) 9- Keep all stormwater controls in place until all areas are stabilized. 10- Complete all basin work. 11- Install grouted rip rap. Per detail note #6. |