Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UNDERGROUND
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2006 | ELECTRIC - UNDERGROUND | Approved | IVRS - Inspection :* | |
| 07/19/2006 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* | |
| 07/13/2006 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1. WHICH PERMIT IS CARPORT CANOPY LIGHTING ASSOCIATED WITH? WE HAVE CONDUITS RUN TO THEM. OK PVC FOR LIGHTING FRONT AREA BOLLARDS AND STEP LIGHTING. |
|
| 07/10/2006 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK PVC UNDER SIDEWALKS UPPER EXTERIOR FRONT |
|
| 05/01/2006 | ELECTRIC - UNDERGROUND | Cancelled | IVRS - RI canceled | |
| 04/28/2006 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK TO COVER TRANSFORMER SECONDARY RACEWAYS. NOTE: INSTALL WARNING RIBBON MINIMUM 12" ABOVE RACEWAYS BEFORE COVERING - NEC 300.5 (1)(3) |
|
| 11/28/2005 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1) OK 6 GROUND RODS AND CADWELDS UNDER SLAB 2) OK 1 FLOOR BOX ASSEMBLY UNDER SLAB |
|
| 11/16/2005 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* OK 3 GROUND RODS AND CA?? | |
| 11/15/2005 | ELECTRIC - UNDERGROUND | Not ready for Inspection | IVRS - Inspection :* | |
| 11/07/2005 | ELECTRIC - UNDERGROUND | Partial Approval | OK COLUMN LINE 18 TO SERVICE EQUIPMENT AND TELCO OK 2-250 MC FOR BONDING |
|
| 11/03/2005 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :*OK PVC CONDUITS FOR TI PANELS AND TELCO. OK PVC CONDUITS FOR ELECTRIC AT ELEVATOR ROOM WEST OF COLUMN LINE 18 OK 8-4" CONTINUATION TO TEP CABINET/??? |
|
| 10/13/2005 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :*OK 8-4" SCH-40 PVC FROM ELECT. ROOM STUB UP TO 10' WEST OF BLD.FOOTING, AT WEST EXTERIOR WALL. |