Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS MADE OK 2) OK FOR C OF O PENDING ANY THER INSPECTIONS, CONGRATS! |
|
| 08/19/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE DON'T CALL FOR FINAL UNTIL YOU ARE READY |
|
| 08/17/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) A FURNCO COUPLING IS NOT APPROVED WITHIN OR UNDER A BLDG. USE THE CORRECT FITTING I.E. MISSION STYLE COUPLING |
|
| 08/15/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CONTRACTOR CUT IN DRAINAGE FITTING FOR HAND SINK, THEN COVERED W/O INSPECTION. |
|
| 08/05/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) HAND SINK MAY NOT BE INDIRECTLY WASTED 2) ICE MACHINE DRAINS NOT APPROVED |
|
| 07/22/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE CORRECT BACKFLOW PROTECTION FOR ALL DIRECT CONNECTED H20 SYSTEMS THAT REQUIRE IT 2) HAVE ALL PLUMBING SYSTEMS INSTALLED 3) ALL IDIRECT DRAINAGE REQUIRES MINIMUM 1" AIR GAP AT TERMINATION INTO RECEPTOR 4) ALL DRAINS TO BE GRAVITY TO RECEPTOR 5) SUPPORT COPPER TUBING FOR H20 SUPPLY TO 3-COMP. SINK 6) PROVIDE OPEN FRONT SEATS AT STOOLS 7) FLUSH VALVE HANDLES FOR STOOLS TO BE ON WIDE SIDE OF RESTROOM 8) ONLY (1) SLIP JOINT CONNECTION SHALL BE DOWN STREAM OF P-TRAP 9) USE CORRECT LISTED GLUE FOR YOUR MATERIAL TYPE 10) THIS IS NOT A COMPLETE LIST |