Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 12/09/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. GAS PLAN INCOMPLETE. PROVIDE A GAS ISOMETRIC SHOWING DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION (PLAN DOESN'T SHOW ANY SIZING) 2. WHAT IS EXISTING WHAT IS NEW - SEPARATE THEM AND TEST NEW PIPING TO TEN POUNDS. 3. YOU WERE NOT GIVEN PERMISSION TO ENERGIZE THE NEW PIPING - GAS IS ON |