Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2005 | ENGINEERING - FINAL | Approved | RAILING HAS BEEN INSTALLED ON THE HC ACCESS RAMP PER ADA SPECS. C OF O APPROVED | |
| 07/29/2005 | ENGINEERING - FINAL | Partial Approval | Temporary C of O approved by Dave Mann. The contractor will need to install a handrail at the access ramp and the exit door will be closed and not used until the rail is installed. | |
| 07/27/2005 | ENGINEERING - FINAL | Denied | DENIED, PROVIDE HAND RAILING ON HC RAMP AT REAR OF BLDG. PER CITY OF TUCSON DEVELOPMENT STANDARD 3-1.0, SUBSECTION 4.2 (F) : HANDRAILS WILL BE REQUIRED FOR ANY RAMP OTHER THAN A CURB RAMP WITH A RISE GREATER THAN SIX INCHES OR LONGER THAN SEVENTY TWO INCHES. | |
| 07/19/2005 | ENGINEERING - FINAL | Denied | DENIED, ITEMS #1, 4, 5, AND 6 HAVE NOT ADDRESSED. ITEM #1 - REMOVE ALL CONSTRUCTION DEBRIS AND MATERIAL FROM SITE. #4 - INSTALL HANDRAIL ON HC RAMP PER CITY OF TUCSON DEVELOPMENT STANDARD 4.2 (F) (2). #5 - REPAIR ASPHALT IN FRONT OF HC PARKING AREA #6 - COMPLETE ALL SITE WORK PER SITE PLAN. #7 - 1" DRAIN HOLES WERE ADDED TO THE BOTTOM OF THE BLOCK WALL ON THE NORTH SIDE TO PREVENT PONDING OF WATER ON SITE; HOWEVER, THE HOLE WILL EASILY FILL WITH DEBRIS AND MATERIAL. WALL OPENINGS MUST BE INSTALLED TO ENSURE CONTINUOUS DRAINAGE AND PREVENT FURTHER PONDING. |
|
| 07/14/2005 | ENGINEERING - FINAL | Denied | 1- Clean site. 2- Install wheel stop. 3- Install bike rack. 4- Install handrail on HC ramp. 5- Repair asphalt infront of HC parking area. 6- Complete all site work. 7- Provide drain hole in block wall on northside of property to stop ponding. |