Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 04/20/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MUST UNCOVER ALL PLUMBING PIPING 2) REBAR TO BE MINIMUM 3" AWAY FROM PIPING 3) REBAR TO BE MINIMUM 3" AWAY FROM DIRT 4) MINIMUM 15" OVERLAP REBAR 5) REMOVE RUST FOR REBAR-FOOTINGS TO BE DUG STRAIGHT DOWN FROM FORMS 6) AT PRESLAB INSPECTION ALL PLUMBING TO BE WRAPPED IN CONTACT WITH CONCRETE |