Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T05BU02920


Addresses:

6422 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
02/05/2007 STORMWATER FOLLOW-UP INSP Approved
12/13/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
11/30/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
11/27/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
11/13/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
11/06/2006 STORMWATER FOLLOW-UP INSP Correction Required CLEAN UP CONCRETE SPILLAGE AND COMPLETE STABILIZTION OF SOUTH PERIMETER OF SITE.
07/25/2006 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGES - SEE PREVIOUS NOTES
06/28/2006 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGES - SEE PREVIOUS NOTES
06/21/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. STABILIZE AREA OUTSIDE PERIMETER WALL, AND REMOVE ALL CONSTRUCTION DEBRIS.
2. PROVIDE A DESIGNATED CONCRETE WASHOUT AREA.
3.PROVIDE A COPY OF THE SWPPP AND THE INSPECTION REPORTS ON SITE.
4. BRING R/D BASIN INLETS TO GRADE TO PROVIDE RETENTION ON SITE.
I LEFT VOICE MAIL FOR ROB CAYLOR 444-0100