Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2010 | GRADING - INTERMEDIATE | Approved | ||
| 03/26/2009 | GRADING - INTERMEDIATE | Partial Approval | SITE WORK APPEARS TO BE CLOSE TO COMPLETE VERTICAL WORK CONTINUING |
|
| 02/17/2009 | GRADING - INTERMEDIATE | Partial Approval | GRADING WORK BEING DONE TODAY SITE WORK CONTINUING FOR NEW BUILDING |
|
| 01/21/2009 | GRADING - INTERMEDIATE | Partial Approval | VERT WORK CONTINUING | |
| 10/21/2008 | GRADING - INTERMEDIATE | Partial Approval | SITE STILL DOING VERTICAL WORK | |
| 09/05/2008 | GRADING - INTERMEDIATE | Partial Approval | VERTICAL CONSTRUCTION CONTINUING | |
| 06/09/2008 | GRADING - INTERMEDIATE | Partial Approval | ROCK WORK IN DRAINAGE WAY COMPLETED | |
| 02/12/2008 | GRADING - INTERMEDIATE | Partial Approval | WALKED SITE WITH GORDON PRESCHOOL IS DUE TO OPEN-2 NORTH MOST RAMPS DO NOT MEET ADA REQUIREMENTS ALL TRAFFIC TO BE FUNNELED TO SOUTH RAMP CONSTRUCTION TRAFFIC TO BE SEPARATED FROM PUBLIC ACCESS TO SITE IS TO BE OFF OF GOLF LINKS |
|
| 11/15/2007 | GRADING - INTERMEDIATE | Partial Approval | SUBGRADE HAS BEEN SET CURBING IN PLACE PAVING SHOULD BE COMPLETE IN ABOUT 2 WEEKS RIP RAP WORK ALMOST COMPLETED IN DRAINAGE ON EAST SIDE OF SITE |
|
| 09/28/2007 | GRADING - INTERMEDIATE | Partial Approval | MET GORDON ON SITE REVIEWED NEW BASIN GROUTED RIP RAP BEING PLACED MINOR CHANGE TO FINAL STABILIZATION FOR BASIN. GORDON IS TO CONTACT TONY TSANG FOR A LETTER OR REVISION TO PLANS |